Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

You are using software which is blocking our advertisements (adblocker).

As we provide the news for free, we are relying on revenues from our banners. So please disable your adblocker and reload the page to continue using this site.
Thanks!

Click here for a guide on disabling your adblocker.

Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

Gakon installs 1,088 solar panels

Gakon has placed 1088 solar panels on the roof of the factory, the office and the shipping. The construction of no less than 1088 solar panels went through two phases. During the first phase, the mounting systems were installed by partner Van der Valk Solar Systems from Monster. The solar panels were installed in phase two. Quite a job, as no fewer than 1088 solar panels had to be installed. This installation was professionally carried out by Wattco NL from Maasdijk.

Due to the placement of the solar panels, Gakon now uses a sustainable energy source. Renewable energy ensures that there is less emission of harmful substances. This improves air quality and counteracts global warming.

For companies and investors in horticulture, Gakon offers the solution for generating usable energy from the power of the sun. A system has been developed for this in which a solar panel can be integrated into a greenhouse cover. This technique is widely accessible to a wide target group.

For more information:
Gakon Horticultural Projects
info@gakon.nl 
www.gakon.nl 

Publication date: