PB Techniek is growing fast, which is why a new office is being built on a highly visible location along the A20 highway in Maasdijk. The building will not only be home to the office and the various departments, but the production room will also move to the new location.
Construction of the new building has started as of September 2018. On the 14th of September, the first pile was driven by Aad Brabander. Aad is the father of the current directors, Koen and Paul Brabander.
For more information:
PB Techniek
[email protected]
www.pb-techniek.nl