Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

You are using software which is blocking our advertisements (adblocker).

As we provide the news for free, we are relying on revenues from our banners. So please disable your adblocker and reload the page to continue using this site.
Thanks!

Click here for a guide on disabling your adblocker.

Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

Large workforce needed to install gigantic liner

They had to get up early last month at Westland Peppers in The Netherlands. The reservoir liner was being drawn over the new reservoir - and in order to make sure that the wind wouldn't catch it, they began at 6am.




At the beginning of the month, they began with the task: the renovation of the large reservoir. A beautiful one, because in the new reservoir banks an overflow channel has been installed.

Watch the video via Facebook or watch the full report here.

For more information;
Van Daalen GWW
Dirk-Jan van Daalen
Oudedijk 7a
2676 NC Maasdijk
+31 174 – 54 02 83+31 174 – 54 02 83
+31 6 22 48 3767+31 6 22 48 3767
[email protected]
www.waterbassin.nl
You'll need Skype CreditFree via Skype
Publication date: