A large water basin has been built next to the new Beekenkamp Plants site in Maasdijk. Three locations near the propagator should receive water from this basin in the future. But before that happens, the basin cover needs to be withdrawn. A video of this job appeared on LinkedIn where colleagues from all locations came to help.
Related Articles → See More
-
“Their solution shows that water quality does not have to be an uncertainty”
-
Continuous monitoring drives precision fertigation in hydroponic berry crops
-
How to estimate water savings in hydroponic strawberry cultivation using gutters and Spacers
-
Drone data improve yield and water use for high value horticultural crops
-
Hydrogen-rich irrigation systems shows promise for greenhouse crop performance
-
Using drip irrigation to change Zambian horticulture
-
Mexican border water scarcity challenges nearshoring
-
Tomato cultivation using purified process water from vegetable processing: EC control challenge
-
New generation ultrafiltration units for sustainable and reliable water treatment
-
Australia charges filed over unauthorised blueberry water works