Turkey: Geothermal greenhouse to be built in Didim

The environmental assessment process for a geothermal greenhouse to be built in the Didim district of Aydin has officially started. The greenhouse which will cost around 50.000 USD to build, will be 3-hectares in size with a geothermal well drilled within the area. The heat generated from the well will be enough to increase the greenhouse temperature up to 25 degrees by itself.

The greenhouse will be built with a PE greenhouse cover at the top of the galvanized steel construction and polycarbonate cover on the sides. The greenhouse is expected to become operational during 2020 and will be used to grow tomato, green pepper, cucumber, and cut flowers. 16 people will be employed at the greenhouse when it becomes fully operational.

Source: Aydin Hedef


Publication date:



Receive the daily newsletter in your email for free | Click here


Other news in this sector:


© HortiDaily.com 2020

Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber