Announcements

Job offersmore »





Tweeting Growers

Top 5 - yesterday

Top 5 - last week

Top 5 - last month

Exchange ratesmore »




Netherlands: Hoogweg Aardwarmte triplet ready to go

Preparations for this project started mid 2017 with the concept and detailed design of the triplet wells phase, followed by the process of securing the permits and materials and services required to deliver the wells. In January 2018 three conductor pipes have been successfully installed. In February Drilltec’s VarioRig VDD370.2 will be rigged up to commence with drilling the first of three wells. Each well is planned to be delivered within 30 days, including well test.



For this project, Well Engineering Partners is responsible for the well designs, project planning, tendering and coordination of the contracting of the materials and services suppliers. During the execution phase WEP provides the coordination, management and supervision for the project while other companies will provide materials and services.

For more information:
Well Engineering Partners
Toldijk 17-19
7901 TA Hoogeveen
The Netherlands
T: +31528227710
F: +31528227715
info@we-p.nl
wellengineering.nl

Publication date: 2/6/2018

 


 

Other news in this sector:

2/19/2018 Geothermal Resources Council announces 2018 scholarships
2/13/2018 Feasibility of flexible thin glass in greenhouses
2/7/2018 "30% of Spanish primary energy consumption is spent on food"
2/6/2018 Video shows how geothermal drilling works
2/5/2018 UK: Getting the humidity basics right first
2/2/2018 Switzerland: Sustainable energy supply for Grob’s vegetable cultivation
2/2/2018 Netherlands: First well of geothermal doublet for ECW Andijk
2/2/2018 "Canadian government needs better plan for spending cap-and-trade funds"
2/1/2018 Is renewable energy good for your business?
1/29/2018 US: Patent for cooling method of electrical components in a geothermal well
1/25/2018 CAN (BC): Carbon tax relief applications available
1/23/2018 California grower increases solar power capacity
1/23/2018 Russia plans combined heat and power upgrades
1/23/2018 "We cannot permit a power failure"
1/22/2018 CAN (QC): Preferential electricity rates for MJ producers extended
1/22/2018 Steam separator designed to cool geothermal water from 140-100°C
1/19/2018 CAN (ON): Year 2 of Cap & Trade: 3 things to monitor
1/19/2018 New Zealand: Greenhouse energy usage and waste survey
1/18/2018 US (IN): Purdue Extension offers energy efficiency workshops
1/18/2018 UK: Angus strawberry grower goes for clean energy