Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

You are using software which is blocking our advertisements (adblocker).

As we provide the news for free, we are relying on revenues from our banners. So please disable your adblocker and reload the page to continue using this site.
Thanks!

Click here for a guide on disabling your adblocker.

Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

Russia: VB Group to realize 10 hectare greenhouse project in Siberia

Early June the greenhouse division of VB Group started the construction of a 10 hectare Siberian greenhouse project near the city of Tomsk in Russia.



The preparations and material deliveries for the greenhouse project are close to being completed and the Russian builders have started the construction works. The greenhouse must be completed before winter, which starts early in Siberia. The first snow is expected in October, so it is a challenge to have the heating systems operational in time for the 10 hectare greenhouse. Last year the foundation has already been set, to ensure that no problems would arise because of frost in the soil, which with temperatures up to minus 40 degrees Celsius can go down to 2.5 meters deep.



All elements and parts of the greenhouse have been calculated based on the harsh weather conditions, where the heating and insulation have been given extra attention. Also the availability of sufficient irrigation water in the winter months has required a solid preparation.



The planning is to plant the first 4 hectares by early December. KDV is convinced that in view of the good preparation and communication this will be a realistic goal.

For more information:
VB Group
P.O. Box 41
2678 ZG De Lier
The Netherlands
Telephone: +31 (0)174 522222
Fax: +31 (0)174 510454

info@vb-group.nl
www.vb-group.nl
Publication date: